Full Turnkey Project at Cement Works

Baldwin & Francis secure a major supply and design installation for a Cement Chlorine By-Pass Project

The project included installing an Alternative Fuel and raw material system (AFR) and a Chlorine Bypass system that reacts to an increased use of high chlorine content fuels.

This included a wide range of equipment and services from B&F including all Power and Control cabling installation and cable design, supply and install various 800Kva, 3.3KV-400V Transformer’s, various 400V Intelligent MCC’s, UPS panel’s, Indoor and outdoor lighting & a CCTV security system

The scope also required a bespoke Signals and Communication system for the Conveyors which was supplied by Baldwin & Francis.

Cauldon Cement Works Turnkey

Industry

Heavy Materials Handling & Aggregates

Products used

Medium-Voltage Motor Starters and Switchboards (MCC’s)

Low Voltage MCC’s and Switchboards

Location

Cauldon, UK

Client

lee avatar

Talk to a specialist about this project

Get in touch

To find out how well we can meet your needs, call our support team on +44 (0)114 286 6000.

How we work

Accreditations & memberships

Ready to get started?
Talk to us today

The B&F Team has experience across all our sectors and many electrical installations. Get in touch with one of the team to see how B&F can assist you with your project requirements.